Thứ Hai, 5 tháng 4, 2010

Where in the world am I?

IMAG0150

Well, I’m sat in a hotel looking out of the window at a very sunny area just outside of Boston, MA. I’m here for the Autodesk AEC 2011 Media launch. This is the first time I have been to Boston; looks like a great place. Kind of strange, as on my way to the hotel, I passed a sign for “Winchester”; I had only left “Winchester, Hampshire, UK” just 9 hours earlier!

http://www.visitwinchester.co.uk/ 

I guess the first settlers who landed here couldn’t think up any original names, so to make them feel at home, they used City names from the UK. My American history is very poor, so I feel I need to know more.

Burning Hell Paddles to the Dawson City Music Festival

This is pretty cool, I heard recently on CBC Radio 3 that The Burning Hell will be playing at the Dawson City Music Fetival (#1 on the list of music festivals I want to visit some day!) this summer. What's cool about that is how they are getting there. They will first drive across the country to Whitehorse, an epic journey in itself. However, not satisfied to do things the usual way, they will then be hopping into canoes and PADDLING the 730 kilometers to Dawson City down the Yukon River. What a helluva way to do it!

In related news, The Burning Hell write on their blog about why Bruno, SK, has the "coolest indie music scene in Canada." You can read all about it at http://www.wearetheburninghell.com/node/106. Here's an excerpt:
Sorry Montreal: your glory days are over, and no amount of fires or arcades or little moustaches, tight pants and 80s sunglasses can save you. Bruno, Saskatchewan is the best indie music scene in Canada.
Who knew?


And in other news, I just realised the The Burning Hell member Mathias Kom is half of a duo with Kim Barlow known as Spring Breakup. Kim & Mathias played a house concert in my basement last year.

Thứ Bảy, 3 tháng 4, 2010

It's Springtime & Time To Ride

OK, so some of us haven't quit riding all year, but the number of excuses not to ride is rapidly dwindling with the warm springtime weather. My kids and I have been out quite a bit lately and my younger daughter (4) really loves being the stoker behind me on her Adams Trail-a-Bike. It's so much easier to pull than the trailer and she pedals too. My older daughter (7) loves riding her own bike but enjoys stints on the Trail-a-Bike too. When she's back there, I can really feel her contributing which is something I don't detect with the younger one. Our range so far with the older daughter riding her own bike is a 6.6 km return trip to the grocery store. I look forward to seeing that grow over the summer.

I came across this video over at bicyclesmile.com and thought I'd share it with you here. Gives lots of warm happy "springtime with the kids" feelings.

Thứ Năm, 1 tháng 4, 2010

Autodesk Revit Civil - not

dig_itYou only need to speak with somebody who has been using Revit for a long time and one of their biggest complaints is the limited site tools in Revit. Whilst you may argue that Revit is a building modelling application, buildings do sit on sites and are not in isolation, so this is something which is essential to the whole BIM process. Having spent many hours fighting with the terrain tools in Revit Architecture myself, it’s interesting to hear that Autodesk are starting to consider this particular area for Revit. So one thing that you may or may not of heard too much noise about is a couple of Civil focused extensions that may get released for Revit. Having spoken with a couple of Autodesk insiders these tools are in pre-alpha at the moment, but code named “Dig-it” and “Bucket”, these extensions may well start to drive a Civil focused version of Revit. “Dig-it” will be an advanced ground modelling extension, which will address the sort falls provided by the current terrain tools with ability to make road and pavements. “Bucket” will provide far more robust cut and fill calculations. So hopefully Autodesk will see the light and will release “Dig-it” and “Bucket” to resolve all our dirt problems.....

Chủ Nhật, 28 tháng 3, 2010

progeCAD Upgrades: What are my choices?

Until 11 May 2010, CADDIT.net is sharing in a global limited-time 15% discount for all upgrades to progeCAD 2010 Professional. This includes discounts to the following basic upgrade options:

The procedure for upgrading progeCAD online is simple: select the matching progeCAD upgrade for your current license, fill out the bottom text box of the product page with your current serial code(s) and complete the order as usual.

It is also possible online to migrate or convert different CAD licenses to progeCAD Professional, Network or USB versions.

To upgrade from an older version of AutoCAD LT (2004 or newer), IntelliCAD 6, certain versions of TurboCAD Professional, Vectorworks, Microstation, BricsCAD and other software HERE. As with direct upgrades for progeCAD, upgrading simply requires entering a valid license code and a description of the old CAD software in the bottom text box provided. Always check this cross-over order form for a list of software currently qualifying for upgrade.

To convert from either progeCAD Professional stand-alone license or another CAD package to progeCAD Professional USB version, use this order page and select which system you are upgrading from the drop-down menu "product-current" toward the bottom of the order page, as well as filling out the current serial number. The final price for the USB upgrade varies depending from which previous CAD program that one upgrades from.

For example, why "upgrade" from AutoCAD LT 2006 to progeCAD Professional 2010? Here are some reasons: AutoCAD DWG 2010 file editing, Windows Vista & Windows 7 support, 3D modeling and rendering, AutoLISP and VBA programming, Google Earth export, Express Tools, Quick Dimensioning, PDF import, Raster to Vector tools, gradient hatching - all offered in progeCAD at modest cost - but not in AutoCAD LT 2006. In fact, while the gap between AutoCAD LT and AutoCAD widens, the gap between progeCAD and AutoCAD is narrowing.

A full version of the new progeCAD 2010 Professional (with 10.0.4 patch) can be downloaded HERE. It will run without limitation for 30 days before you can decide if it meets your needs.

Thứ Sáu, 26 tháng 3, 2010

Testing....testing....

 Will Glacier Gloves finally win us over from pogies?

Gloves vs. pogies. Like so many similar debates (paper vs. plastic, cloth vs. disposable), it probably comes down to personal preference.
The other day, we tested gloves and pogies on a 15-mile paddle. Water temperature: 36 degrees. Air temperature: 40 degrees. Winds: 5 to 10 knots.
We gave gloves their best shot, using Glacier Glove's neoprene Premium Paddling Gloves. We've tried a lot of other gloves, and we've found most to be too thick and inflexible to allow us to use our fingers for much of anything. By contrast, we were impressed by the amount of dexterity we had with these gloves. We were able to put on our spray skirts, take photos, raft up and hold each other's decklines, and even push the tiny toggle on the camera that switches between still shots and movies.
Alec's hands stayed comfortable and warm, even when they didn't stay dry. Sharon's didn't stay as warm; for her, there's no substitute for pogies, which allow the fingers to warm each other. (The obvious downside to pogies, however, is that they leave you with no hand protection during a rescue--a serious problem--or even while taking photos or eating lunch.)
These were, by far, the best gloves we have tried. They are flexible and fit well. (We're also fans of Glacier Glove's neoprene 3/4 dome hat and full dome hood. The latter keeps your neck warm in addition to your head--a definite advantage in seriously cold weather!)

Can a low-frequency horn be heard further than a high-frequency whistle?

On a recent trip to West Marine, we came across this funny-looking low-frequency marine horn. We thought its sound might travel further than the sound of our ordinary marine whistle. So we tested them in the harbor--Alec with the horn, Sharon with the whistle--moving incrementally away from each other.
There are a couple of problems with this experiment, of course. We didn't control for different lung capacity, different hearing ability, or the minimal effect of the light wind in the harbor. Nonetheless, we were able to hear the sound of the marine whistle a little bit further than the marine horn. 
The horn is also much larger than the whistle--too large to stow in a PFD pocket. After today, it may not see much more of Lake Michigan.

Thứ Năm, 25 tháng 3, 2010

What’s new in Revt Architecture 2011?

image

So its the 25th March 2010 and its my daughters 4th Birthday; HAPPY Birthday Bethan. :-) and after a wink and a nod from Autodesk I can also finally reveal what's new in 2011! No, not the year, but this year's release of Autodesk Revit Architecture. Having spent the last 7 months participating in the alpha and beta program, I am genuinely excited about this release. But then I am always passionate about a new release of Revit, as it opens up new opportunities, gives us new toys to play with and helps drive the adoption of BIM within our industry.

So what's in RAC 2011 you may ask? RAC 2011 introduces some new concepts, an improved interface (needed too after the grief that Autodesk got about the Ribbon for 2010) as well as some genuine user feature requests. Whilst this blog just covers the main features it does not cover everything, but I do plan to cover specific functionality in future articles.

Ribbon and UI

So let me start with the interface, as this has been a constantly debated, argued, discussed subject amongst many a Revit user on the AUGI forums. So these are the headliners for UI improvements.

  • Contextual Tab display
  • Contextual Tab display behaviour
  • Modeless Properties Palette
  • Modify Tab is both static and contextual
  • Modify Tools improvements
  • Quick Access Toolbar customization
  • Resizable Dialogs
  • Worksets and Design Options

image

The most obvious improvement and a complaint I personally had with 2010, was actually getting access to modification tools. 2011 allows rapid access to modification tools, no more clicking backwards and forwards between Ribbon tabs. When you select a tool and start to work with it, the modify tools are constantly at hand. The Ribbon also seems to be a lot faster and there is icon clarity with other Autodesk solutions. The other obvious change is the disappearance of the Type selector from the Ribbon. This is not going to be to everybody's taste; as it now resides in a modeless Properties Palette.

imageThe Modeless Properties Palette can remain open or closed. This reduces the need to “click” open the type or instance properties, as settings are always quickly visible. It takes a bit of getting use to and does take up screen real estate, but it can be docked onto another monitor if you have a dual screen setup. After a short time, I found that you do get use to it and access to properties requires far less picking and clicking. If you don't like the PP palette on screen all the time you can hide it with a keyboard short cut, but this then causes you a bit of an issue as the Type selector is no longer accessible, but you can get around this as you are able to add the type selector to the QAT (quick access toolbar).

image

The QAT is now customisable as it has its own dialogue box which allows you to reconfigure tools quickly if required. Other noticeable changes to the UI include resizable dialogs as well as a workset and design options improvements. The latter can be easily accessed from the main window without having to hunt through various ribbon tabs.

Worksets and Linking

A number of enhancements have been added which will assist those that use workset as well as linked files. A linked Revit model viewed By Host, will set the visibility of linked model worksets which share the same name as your host model worksets to the visibility of the host model worksets in that view. In view Visibility Graphics under the Linked Revit Models tab, linked model worksets can be individually turned on or off . A new Manage Worksets Tab within the Managed Links dialogue also allows you to open or close worksets in a linked model file. These linked management features are an absolute god send and will save you a lot of time when managing large linked datasets.

Workset visibility has been given far greater control on a project-wide basis. The Worksets dialog now offers the option to change the visibility of a workset globally. The Worksets tab in individual views has been improved to allow the per view workset visibility to be visible, not visible or to follow the global setting. Trust me, if you use worksets and linked files, these improvements alone are worth the subscription renewal, even in these financially difficult times. Whilst there is still much to do improving Revit at all levels, (please don't get me started on limited site tools, stairs and railings :-) ), workset and linked file improvements really start to help to address the need to define sub models when the Revit model gets too large to handle in one super model. To help with performance , speed improvements have been made and a project which has been upgraded to 2011 will now benefit from a multiple threading thus improving opening times.

To support the linked model approach, linked models can now be tagged. A new management feature has also been included which allows the user to track and watch if Tags lose their hosted elements. The Reconcile Hosting command opens up a new browser allowing you to decide what to do if a Tags does loses its host.

Graphic Display

In RAC 2010, Autodesk migrated from OpenGL to Direct 3d. This has allowed further graphic improvements to be made in RAC 2011. If you have a supported Graphics card you will be able to enable Ambient Occlusion, which is accessible via the Graphics Display Options dialog box. Those that are familiar with using visualisation tools such as 3dsmax will know all about Ambient Occlusion. I suppose the best way to describe Ambient Occlusion is that it adds realism to models by taking into account attenuation of light due to occlusion. Ambient occlusion attempts to approximate the way light radiates in real life, especially off what are normally considered non-reflective surfaces. Look in a room at the corners between the wall and the ceiling; you will notice the soft shaded falloff of material colour which is not defined by the sun, this is Ambient occlusion.

image

Two additional view styles have now been added to the View Control Bar, these include a Realistic View which will display materials and textures defined to elements in real-time. You also have a Consistent Colours view styles, which displays colours in a constant manner across all faces of the model in a 3d view.

Realistic View

image

Consistent Colours

image

To get the real benefits of these new graphic features you are going to need a supported graphic card. If you have a relatively new card which supports Direct X, you should be ok. My laptop is a Dell E6400 latitude with Windows 7 (64bit) and a Quadro shared graphics and it worked fine.

Conceptual Massing

If you have read my blog in the past, you will know I am a big fan of the conceptual massing tools introduced in RAC 2010. However, one annoyance in 2010 was the loss of the sketch mode when creating forms. Rest assured it totally confused the users in my office! So after listening to user feedback, Autodesk have reintroduced the sketch mode back to forms created with lines. You are able to edit the profile of a form and the geometry automatically updates. This works with revolves, extrudes, blends and sweeps. If you choose to lock profiles the change is made to the top and bottom profiles. This is a excellent addition and combines the best of old school massing with new school massing approach.

You can now dissolve a form using the new dissolve function. Say you build a form from lines or reference lines and you decide you want to take it back to the line work it was originally created from. Just select the form and choose dissolve. Once a form has been dissolved the surface created is lost, however the profiles and path remain, allowing you to edit these and recreate the form after you have made any adjustments.

A new feature called the workplane viewer has now been included, making the editing of profiles within a form a lot easier. This is a floating dialog imagebox that provides a dynamic view and when adjustments have been made to a profile they are automatically adjusted within the main form.

The divide surface tools introduced with the new conceptual massing tools in 2010 has been further enhanced and you can now divide a surface by intersecting levels, reference planes and lines drawn on a reference plane.

RAC 2011 also sees the introduction of a new family called the Adaptive component family, to be honest this is one of my favourite features in 2011. It expands the conceptual massing tools further and I am really looking forward to using this new family type within projects. Described by Autodesk; the Adaptive component resolves the issues related to stitching border conditions of divided surfaces. It also address the problems of creating and placing pattern component panels (triangular, pentagonal, hexagonal, etc.) on non-rectangular and non-evenly spaced grids. The adaptive components can also be used to create a repeating systems generated by arraying multiple components. When you place a point in an Adaptive family you can define whether imageit is a placement point and these can be numbered accordingly. Placement points can then be connected together with 3d linework, creating a sort of rig. When this family is placed into a project or a conceptual massing family, as you place the points the family will automatically flex and adjust based on the placement points. If you take a look at the images you hopefully see what I mean. Above is the new adaptive point family; below you can see the resulting family in use to create the frame structure.

image

One feature which may go unnoticed is the ability to do a solid - solid cut on two forms. described as follows; You can cut out one solid from another, but the resulting form is not a geometric combination. When the Cut tool is used on 2 solid forms, the result is separate geometry. It certainly makes for cleaner geometry.

To improve the 3D working environment, you can now use the align tool in 3d as well as 2d. You can use a node, vertex, edge, surface form or level as your target, then all you need to do is pick then element you wish to align.

Parameter enhancements

I regularly tell users that it's the "I" in BIM which is one of the most important assets of the BIM process. So being able to extract data from your Revit model so that it can be usedimage for other functions is an everyday occurrence for the users I work with. So to improve the data pipeline workflow, Autodesk have introduced what is referred to as a Reporting Parameter. These are a special parameter type which do not actually drive forms or geometry, but instead will report its own value driven by a dimension in the family model. What this actually means is that a dimension can be uncovered and reported in a way that can be used for downstream applications. A simple user case maybe that you need to report the width of a wall for a door or window frame in your schedule. Until now this was not possible, but with a reporting a parameter assigned in your door or window family you can pick up the wall width instance so that the reporting parameter can report the width of the wall and this can be scheduled.

Rendering

Mental ray rendering was introduced with RAC 2009 and generally it's been a hit with Revit users. Certainly the quality of renders I have seen has been superb. But to some extent quality was limited by desktop power, with rendering being limited to 4 cores only. This meant, that you may have a super all bells and whistles workstation with processors multiply , but the 4 core throttle resulted in Revit noimaget being able to make use of all the workstation power at your disposal. In 2011, this restriction has been removed. In 2011, Autodesk has also made updates and modifications to material editor interface as well as deploying a common material library, you can also now use an image as a background when rendering.

Everyday wish list items

I guess one can assume that Autodesk must have a room somewhere in the factory which is full, from floor to ceiling with user feature requests for inclusion within future releases of Revit. Whilst we all have our favourites, development time, budget and technology restrictions often mean that they are not immediately viable. However, RAC 2011 has included a number, which will be real time savers in my opinion. We now have Repeat last command, which can be accessed off the right mouse contextual menu or enabled via a keyboard shortcut. The contextual menu also now lists the last five commands you have used.

image

You can now select instances across a view as well as across a project and temporary dimensions can now remember any edits made to witness lines per session.

image

There have been a number of enhancements made to text notes, with better control of leader placement. Text notes can now be enclosed with a box with the option to change the text margin between the text and box.

DWG export from Revit has continued to be a contentious point, with the quality of the output not always meeting expectation. However, it really does depend on what your expectation are. I have always been of the view that whilst the output was ok, it would never be as clean as if you where to have drawn it from scratch in AutoCAD. With this in mind and understanding the benefits of what Revit provides, really a DWG export is just a snapshot in time. But I also realise that there are some fundamentals issues when exporting to DWG. Autodesk seemed to have worked hard in this particular area and models which we had, which refused to export to DWG in previous versions of Revit, now happily export as expected and the graphic fidelity is a lot better.

Aligning views in a consistent manner on drawing sheet has also been a general pain in the backside. Those that have come from an AutoCAD background ( I would guess in many cases that's around 95% of us) have found the imageapproach to placing views poor compared with how you can align viewports in AutoCAD. You only need to look at the AUGI forums and you will see that users have tried to come up with all sorts of weird and wonderful hacks to solve this issue. Well no need to continue hacking, as RAC 2011 says hello to Guide Grids. Guide Grids are a new element which can appear in the active sheet which will allow you to align elements within and between sheets. The following are valid items which will snap to Guide Grids; Levels, grids, reference plans, model crop regions and schedule extents.

Sustainability requirements

One of the key benefits with BIM is the ability to use the model to meet the ever increasing sustainability requirements. Whether you believe all the discussions about global warming that the governments and scientist talk about, is a matter of opinion. But one thing is for sure, as an industry we need to be smarter about how we design buildings and we need to reduce the energy consumption of our buildings. To analyze a building, typically you need 3D data. image Whilst Autodesk already have solutions like Ecotect and Green Building Studio, there is still a need to have tools within your favourite design package to enable you as the designer to make informed decisions. To support this Revit 2011 now includes a sun path tool, similar to the one found in Ecotect. You can use the sun path tool in solar animations; you can also grab it in a 3D view and interactively drag the sun around, depending where you are in the world, to see the impact of solar shading on your design. This is a great step forward and I look forward to seeing more tools included to support sustainable design workflows.

The End

So that's it folks. A quick round up of what new in Revit Architecture 2011. There are other minor functional improvements in this release which I haven't covered such as the sheet list, family editor tweaks, but I am sure you will discover these soon enough. I hope you found this commentary useful and it gives you a good insight into what will be landing on your desktops any time soon. Now back to the birthday party for tea and cake. :-)